Then look no further than Certifiers 2U.
Site meetings are also proving popular at the moment.
Let us take the stress out of planning, building and project management.
We can also deal with all that Council stuff so you don’t have to.
What do you do when the council approves a dwelling with a tin wall right next to the boundary?
Build a fire wall.
Here is the first layer of fire proof lining for the fire wall as part of a performance based building solution.
We thoroughly inspect all layers, joints, seals and products used in all passive fire resistant systems.
What’s wrong with this wall?
Basically there is no fire caulking to screw heads and to joints. Also the top of the sheeting has not been scribed into the corrugations of the roof sheeting.
We do all the required inspections and more. We take our time on site to conduct thorough inspections. A recent frame inspection took 2 hours.
Connect with us today!